Connection Approval Audit Engine

GPS / 5.3.4A Baseline

REQUIRED

Agreed GPS schedule and design data

Required · PSMG §4.1, §4.2

FAT Report

REQUIRED

Transformer factory acceptance test results

Required · PSMG §4.1, §5.2.2

OEM Model Metadata

REQUIRED

Firmware version and DMAT baseline

Required · PSMG §4.8

PSCAD / EMT Study

OPTIONAL

Electromagnetic transient study output

Optional · PSMG §4.3

Connection Agreement

OPTIONAL

Executed connection agreement

Prior RFI History

OPTIONAL

Previous AEMO/NSP correspondence

·